Commercial Projects
Yarra Boatshed Melbourne
Replacing Bored Piers/ Driven Piles
Construction Problems
- Extremely vibration sensitive with 100 year old timber structure adjacent to new structure.
- High water table and collapsing soils.
- Founding depth of over 25 metres.
Solution
- Redesign with screw piles.
- Halving of pile installation time.


